BAĞARASI WPP SUBSTATION (44 MW)

154kV Transformer Substation, Power Transmission Line and MV WPP Electrical Construction Works:

Description of supplied services by our Company under this contract:
*Design and engineering
*Electrical and civil projects

Civil Works: All required civil works for SS, MV cable trenches and OHL

Electrical Works: 154kV 15km 1272 MCM Conductor Transmission Line and 154/34,5 kV BAĞARASI WPP Substation, WPP MV Electric Distribution (Power Distribution Line and Cable),
*Supply, delivery, installation of electrical, electromechanical equipment/material (except turbines)
*test and commissioning ( except turbines )