TEİAŞ (TURKISH ELECTRICITY TRANSMISSION CORPORATION) TRANSMISSION SYSTEM CONSTRUCTION WORKS

Almost 18 % of the 154 kV and 380 kV total number of 700 State Owned TEİAŞ Transformer Substations were constructed by us under TURNKEY BASED CONTRACTS.

AIS & GIS Transformer Substations (154 kV – 380 kV)

The first tender which we had participated and also had won was the ITM-3 and we realized 92 Number of Air Insulated Transformer Substations from that day until today. 70 Number of transformer substation are at 154 kV voltage level and 22 Number of transformer substation are at 380 kV voltage level which were constructed.

380 kV TAŞOLUK Gas Insulated Transformer Substation Construction Works have already been in progress under scope of ITM-217 Contract. 154 kV GİRESUN Transformer Substation Construction Works have already been in progress under scope of ITM-235 Contract.

Overhead Lines

Power Transmission Lines which are needed to be constructed to provide the connection of Generation or Consumption Plants to the 154 kV and 380 kV transmission system which is owned and operated by TEİAŞ in Turkey construction and assembly works and also 2H and Provional Acceptance works are realized by us and delivered to TEİAŞ by energizing.

TOP