ALİAĞA POWER PLANT SUBSTATION-OHL (154 kV)
ALİAĞA ÇAKMAKTEPE NG POWER PLANT 154 kV SUBSTATION and TRANSMISSION LINE CONSTRUCTION WORKS
Description of supplied services by our Company under this contract:
*Design and engineering,
*Electrical and civil projects,
*Civil works,
*Electrical works: Supply, delivery, installation,
*test and commissioning of electrical and electromechanical equipment/material of 154kV Substation and 154kV 30 km Transmission line with 1272 MCM Conductor
- EMPLOYER ALİAĞA ÇAKMAKTEPE Enerji Üretim A.Ş.
- StarJune 1, 2009
- EndNovember 1, 2011
- Total Installed Capacity of NG CCPP244 MW
- YerAliağa/İzmir
- CATEGORY Completed Projects , Completed-Connection of Generation Plants to the Grid , Completed-Natural Gas Combined Cycle and Coal Power Plants , Completed-Thermal Power Plants
- TAGS Completed Projects , ompleted-Natural Gas Combined Cycle and Coal Power Plants