ALİAĞA WPP (90 MW)
154kV Transformer Substation, Oppposite Substation Line Feeder and MV WPP Electrical Construction Works :
Description of supplied services by our Company under this contract:
*Design and engineering
*Electrical and civil projects
Civil Works: all required civil works for SS and MV cable trenches
Electrical Works: 154/34,5 kV ALİAĞA WPP Substation, WPP MV Electric Distribution (Power Distribution Line and Cable) and 154 kV Line Feeder construction at opposite TEİAŞ SS
*Supply, delivery, installation of electrical, electromechanical equipment/material (except turbines)
*test and commissioning ( except turbines )
- EMPLOYER BİLGİN A.Ş/BERGAMA RES Enerji A.Ş.
- StartMay 2009
- EndFebruary 2010
- PlaceAliağa/İzmir
- Total Installed Capacity of The Project90 MV
- Number of Turbines36
- Turbine Brand NameNORDEX