BANDIRMA WPP (90 MW)
154kV Transformer Substation, Oppposite Substation Line Feeder and MV WPP Electrical Construction Works:
Description of supplied services by our Company under this contract:
*Design and engineering
*Electrical and civil projects
Civil Works: All required civil works for SS, MV cable trenches and OHL
Electrical Works: 154/34,5 kV BANDIRMA WPP Substation, 154 kV 46 km 1272 MCM conductor Transmission Line, WPP MV Electric Distribution (Power Distribution Line and Cable),
*Supply, delivery, installation of electrical, electromechanical equipment/material (except turbines)
*test and commissioning ( except turbines )
- EMPLOYER BORUSAN YATIRIMLAR VE ÜRETİM A.Ş.
- StartMarch 2008
- EndJuly 2009
- PlaceBandırma/Balıkesir
- Total Installed Capacity of The Project90 MV
- Number of Turbines36
- Turbine Brand NameVESTAS