İAOSB-ATAER POWER PLANT OHL (154 kV)
İAOSB VE ATAER NG POWER PLANT 154 kV SUBSTATION and TRANSMISSION LINE CONSTRUCTION WORKS
Description of supplied services by our Company under this contract:
*Design and engineering,
*Electrical and civil projects,
*Civil works,
*Electrical works: Supply, delivery, installation,
*test and commissioning of electrical and electromechanical equipment/material of 154kV Substation, Opposite Feeder at opposite SS and 154kV 3 km Transmission line with 2×954 MCM Conductor
- EMPLOYER ATAER Enerji Elektrik Üretim A.Ş.
- StarJanuary 1, 2009
- EndFebruary 1, 2010
- Total Installed Capacity of NG CCPP120 MW
- PlaceAliağa/İzmir