KİLLİK WPP (40 MW)
154kV Transformer Substation and MV WPP Electrical Construction Works:
Description of supplied services by our Company under this contract:
*Design and engineering
*Electrical and civil projects
Civil Works: All required civil works for SS and MV cable trenches
Electrical Works: 154/34,5 kV KİLLİK WPP Substation, WPP MV Electric Distribution (Power Distribution Line and Cable),
*Supply, delivery, installation of electrical, electromechanical equipment/material (except turbines)
*test and commissioning ( except turbines )
- EMPLOYER EKSİM A.Ş./PEM ENERJİ A.Ş.
- StartOctober 2010
- EndDecember 2011
- PlaceTokat
- Total Installed Capacity of The Project40 MV
- Number of Turbines16
- Turbine Brand NameNORDEX
- CATEGORY Completed Projects , Completed-Connection of Generation Plants to the Grid , Completed-Renewable Energy , Completed-Wind Power Plant
- TAGS Completed Projects , Completed-Wind Power Plant