KIYIKÖY WPP (44 MW)
154kV Transformer Substation, Power Transmission Line and MV WPP Electrical Construction Works:
Description of supplied services by our Company under this contract:
*Design and engineering
*Electrical and civil projects
Civil Works: All required civil works for SS, MV cable trenches and OHL
Electrical Works: 154kV 1km 2×1272 MCM Conductor Transmission Line and 154/34,5 kV KIYIKÖY WPP Substation, WPP MV Electric Distribution (Power Distribution Line and Cable),
*Supply, delivery, installation of electrical, electromechanical equipment/material (except turbines)
*test and commissioning ( except turbines )
- EMPLOYER BEŞİKTEPE ENERJİ ÜRETİM TİC. A.Ş.
- StartAugust 2014
- EndJune 2015
- Placeİstanbul
- Total Installed Capacity of The Project44 MV
- Number of Turbines15
- Turbine Brand NameNORDEX
- CATEGORY Completed Projects , Completed-Connection of Generation Plants to the Grid , Completed-Renewable Energy , Completed-Wind Power Plant
- TAGS Completed Projects , Completed-Wind Power Plant