KURTKAYASI WPP (45,6 MW)
154kV Transformer Substation, Power Transmission Line and MV WPP Electrical Construction Works:
Description of supplied services by our Company under this contract:
*Design and engineering
*Electrical and civil projects
Civil Works: All required civil works for SS, MV cable trenches and OHL
Electrical Works: 154kV 2,24km 1272 MCM Conductor Transmission Line and 154/34,5 kV KURTKAYASI WPP Substation, WPP MV Electric Distribution (Power Distribution Line and Cable),
*Supply, delivery, installation of electrical, electromechanical equipment/material (except turbines)
*test and commissioning ( except turbines )
- EMPLOYER ARE ELEKTRİK ÜRETİM TİCARET VE SANAYİ A.Ş.
- StartMay 2015
- EndFebruary 2016
- PlaceKayseri
- Total Installed Capacity of The Project45,6 MV
- Number of Turbines19
- Turbine Brand NameVESTAS