METRİSTEPE WPP OHL (154 kV)
METRİSTEPE WPP 154 kV SS-BOZÜYÜK SS 3×1272 MCM SINGLE CIRCUIT TRANSMISSION LINE CONSTRUCTION (9,47 km)
- EMPLOYER CAN ENTEGRE ELEKTRİK ÜRETİM A.Ş.
- StartOctober 2010
- EndNovember 2011
- PlaceBilecik
- CATEGORY Completed Projects , Completed-Over Head Lines , Completed-TEİAŞ Transmission System Construction Works