ÖDEMİŞ WPP (20 MW)
154kV Transformer Substation, Power Transmission Line and MV WPP Electrical Construction Works:
Description of supplied services by our Company under this contract:
*Design and engineering
*Electrical and civil projects
Civil Works: All required civil works for SS, MV cable trenches and OHL
Electrical Works: 154kV 15,58km 2×1272 MCM Conductor Transmission Line and 154/34,5 kV ÖDEMİŞ WPP Substation, WPP MV Electric Distribution (Power Distribution Line and Cable),
*Supply, delivery, installation of electrical, electromechanical equipment/material (except turbines)
*test and commissioning ( except turbines )
- EMPLOYER KÜTLE ENERJİ YATIRIM ÜRETİM VE TİC. A.Ş./GENPA-ERDEM HOLDİNG
- StartAugust 2014
- EndMay 2015
- PlaceÖdemiş/İzmir
- Total Installed Capacity of The Project20 MV
- Number of Turbines7
- Turbine Brand NameNORDEX
- CATEGORY Completed Projects , Completed-Connection of Generation Plants to the Grid , Completed-Renewable Energy , Completed-Wind Power Plant
- TAGS Completed Projects , Completed-Wind Power Plant