SİNCİK WPP (25 MW)
154kV Transformer Substation, Power Transmission Line+ Opposite Substation Line Feeder and MV WPP Electrical Construction Works:
Description of supplied services by our Company under this contract:
*Design and engineering
*Electrical and civil projects
Civil Works: All required civil works for SS, MV cable trenches and OHL
Electrical Works: 154/34,5 kV SİNCİK WPP Substation, Transmission Line+ 154 kV Line Feeder construction at opposite TEİAŞ SS, WPP MV Electric Distribution (Power Distribution Line and Cable), *Supply, delivery, installation of electrical, electromechanical equipment/material (except turbines) *test and commissioning ( except turbines )
- EMPLOYER ÇİLTUĞ ISI SANAYİ VE TİCARET A.Ş.
- StartJuly 2012
- EndJuly 2013
- PlaceAdıyaman
- Total Installed Capacity of The Project25 MV
- Number of Turbines11
- Turbine Brand NameNORDEX