YUNTDAĞ WPP (57,5 MW)
154kV Transformer Substation, Opposite Substation Line Feeder, Power Transmission Line and MV WPP Electrical Construction Works:
Description of supplied services by our Company under this contract:
*Design and engineering
*Electrical and civil projects
Civil Works: All required civil works for SS, MV cable trenches and OHL
Electrical Works: 154/34,5 kV YUNTDAĞ WPP Substation, 154 kV 26 km 3×795 MCM conductor Transmission Line, WPP MV Electric Distribution (Power Distribution Line and Cable),
*Supply, delivery, installation of electrical, electromechanical equipment/material (except turbines)
*test and commissioning ( except turbines )
- EMPLOYER İNNORES ELEKTRİK ÜRETİM A.Ş.(DOST ENERJİ)
- StartMay 2007
- EndDecember 2007
- PlaceBergama/İzmir
- Total Installed Capacity of The Project57,5 MV
- Number of Turbines23
- Turbine Brand NameNORDEX