+90 312 212 0 222
|
info@gungorelektrik.com
HISTORY
|
CAREER
35
YEARS
HOMEPAGE
ORGANIZATIONAL
HISTORY
MISSION & VISION
POLICIES
QUALITY POLICY
HSE POLICY
ENVIRONMENT POLICY
CERTIFICATES
AFFILIATIONS
CATALOGUE
MAIN ACTIVITIES
CONNECTION OF GENERATION PLANTS TO THE GRID
RENEWABLE ENERGY
WIND POWER PLANT
GEOTHERMAL POWER PLANT
HYDROLIC POWER PLANT
SOLAR ENERGY POWER PLANTS
THERMAL POWER PLANTS
NATURAL GAS COMBINED CYCLE and COAL POWER PLANTS
CONNECTION OF CONSUMER PLANTS TO THE TRANSMISSION SYSTEM
INDUSTRIAL PLANTS and ORGANIZED INDUSTRIAL ZONS
TEİAŞ TRANSMISSION SYSTEM CONSTRUCTION WORKS
AIS & GIS TRANSFORMER SUBSTATIONS
OVER HEAD LINES
OPERATION and MAINTENANCE SERVICES
PROJECT DESIGNING, ENGINEERING and CONSULTANCE SERVICES
ELECTRICAL ENERGY DISTRIBUTION SYSTEMS CONSTRUCTION WORKS
REFERENCES
ONGOING PROJECTS
COMPLETED PROJECTS
FINANCIAL INFORMATION
MEDIA
CATALOGUE
CONTACT US
HR
APPLICATION FORM
OPEN POSITIONS
ONGOING WIND POWER PLANT
Sort By:
Name
Date
Direction:
ASC
DESC
All
Ongoing-Wind Power Plant
IŞIKLAR WPP SUBSTATION (154 kV)
154 kV IŞIKLAR WPP SUBSTATION AND 154 kV 2x3x1272 MCM OHL CONSTRUCTON WORK...
ŞULE WPP SUBSTATION (154 kV)
154 kV ŞULE WPP SUBSTATION, WIND PARK AND 1x3x1272 MCM OHL CONSTRUCTION WORK...
Load more
Completed Projects
Wind Power Plants
Geothermal Power Plants
Natural Gas Combined Cycle and Coal Power Plants
Industrial Plants and Organized Industrial Zones
Over Head Lines
AIS & GIS Transformer Substations
Project Designing, Engineering and Consultance Services
Electrical Energy Distribution Systems Construction Works
Ongoing Projects
Wind Power Plants
Ongoing Geothermal Power Plants
Natural Gas Combined Cycle and Coal Power Plants
Industrial Plants and Organized Industrial Zones
Over Head Lines
AIS & GIS Transformer Substations
Operation and Maintenance Services
Project Designing, Engineering and Consultance Services
TOP